Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_15e02b347b2f8a9674c5dfe415b6a214 http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_710ae1551a466021133c2e5aae8c9907 http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_7e6176d59238d2b109125f7076e5e35e |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D11-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D9-005 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E21D9-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E21D11-40 |
filingDate |
2011-02-14-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_78cad38395bf5d0e3b9c67d3649e8a83 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_446b26e63f0fae16c558717ebe4d3b29 |
publicationDate |
2011-11-24-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
WO-2011144776-A1 |
titleOfInvention |
Incremental tunnel |
abstract |
The invention relates to an incremental tunnel that is built with successive tunnel sections that can vary from 10 to 30 meters in length and have the shape required by the project, and that once inserted in the ground, will form the cement liner making it possible for trains or vehicles to move easily through the tunnel. Said sections will be inserted into the ground as the cutting wheel bores through the ground with the required section. |