Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_1664c6fa6d3a867023bf26f8171319f3 http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_3065988aedf551403e60ba92ec243db6 http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_2c0ada4ab18acf7d99df699b2aebef48 |
classificationCPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02T50-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B64D2011-0046 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y10T29-49826 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B64D11-003 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B64D11-00 |
filingDate |
2010-06-14-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_61c99416b6ebf90fb530f9cf6b3eb404 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e21c3fb23797a3d7d3b1b0b03e1c6807 |
publicationDate |
2011-01-13-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
WO-2011003697-A2 |
titleOfInvention |
Method for reducing the installation time of a supply line |
abstract |
The invention relates to a method for reducing the installation time of a supply line (19) on a first mounting structure (11) in an aircraft. The method comprises the following steps: pre-wiring a luggage storage unit (13) outside of the aircraft (S2); installing a supply line unit (15) in the aircraft at a standardized installation position (S4) predefined by the first mounting structure (11). The installation time of the supply line (19) can be reduced by such a standardization of the installation steps in the course of a final assembly of cabin fixtures. |
priorityDate |
2009-07-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |