http://rdf.ncbi.nlm.nih.gov/pubchem/patent/WO-2005106139-A9

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_684bed0d179e6cff35ae207fd7931842
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_bb676e95a7081083a3c647b6fd2a1b1d
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_9ee12a05c7bf51327bc4b4f54e10bc88
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_64e1c20d17a1fbe58be0ab6cd5a8af3b
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_e84df2b521ca4ea84eda0f04a43054ea
classificationCPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02F9-26
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02F9-20
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F19-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-10
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-08
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02F9-26
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02F9-20
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01M99-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-04
filingDate 2005-04-27-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_1d2fda4b3410b26042c2dc36376ba549
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_42dec986eff43c3127be44001b8cdc57
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_6501aa74b6332df7a2e07e8d64362cde
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e301618b061928a9031f2f65569a8675
publicationDate 2006-12-21-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber WO-2005106139-A9
titleOfInvention Maintenance support system for construction machine
abstract A maintenance support system for a construction machine, capable of accurately planning a maintenance plan for parts. With this system (1), after operation simulation means (12) simulates a condition of operation and work of a construction machine (3) based on a condition of operation for production, load calculation means (13) calculates for each part an accumulated load according to the condition of operation and work, and then life calculation means (14) estimates the life of each part based on the accumulated load. More accurate maintenance plan can be established than in a conventional method where which part is to be maintained is determined based on only operation hours. As a result, possibility where sudden part failure occurs at a stage before an estimated life end can be reduced.
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-7203894-B2
priorityDate 2004-04-28-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID71586773
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID428438116

Total number of triples: 29.