abstract |
Methods are provided comprising providing a sealant composition comprising an aqueous fluid, a diutan composition, at least one gel system, and a leak off prevention material; introducing the sealant composition into a well bore penetrating the subterranean formation; and allowing the sealant composition to form a seal. |