Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_937c113f86034cd4c7c2ef935a033ed4 |
classificationCPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04L1-1822 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04L1-1835 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04L1-1864 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04W72-23 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04W72-042 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04W72-0453 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04L1-1812 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/H04L5-0098 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/H04L1-18 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/H04W72-04 |
filingDate |
2020-12-11-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_b91d33e0fa0b9cb19c01f2f539525a32 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_47d83a2d5950cd6eb7c39d70ff9f2282 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_618f21de23904c2f1d3bc3b6a2c4cb69 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a5a17b587caff4230abfcb6c581efb26 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_62d5126a9c8bcac8161e09ab02368904 |
publicationDate |
2021-04-01-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
US-2021099998-A1 |
titleOfInvention |
Ignoring a Grant in Response to Switching Between Bandwidth Parts |
abstract |
A wireless device receives a first downlink control information indicating a grant for transmission of one or more first transport blocks via a first bandwidth part during a transmission time. The first downlink control information indicates the transmission time. A second downlink control information indicating switching from the first bandwidth part to a second bandwidth part at a switching time is received. A switch is performed, at the switching time, from the first bandwidth part to the second bandwidth part as an active bandwidth part in response to the second downlink control information. The grant indicated by the first downlink control information is ignored in response to the switching time of the switch being earlier than the transmission time indicated by the first downlink control information. |
isCitedBy |
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/US-11234134-B2 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/US-2021111856-A1 |
priorityDate |
2017-10-31-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |