Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_cb609f63f96368225c774aaf3e87314c http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_d5774b34cf6a53a4682ad6acd5336398 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D29-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D29-0266 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D29-025 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D29-02 |
filingDate |
2015-06-18-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_8b48a49e49532b83dd8f39ff1092c8ad http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e36dd38c621b48e5eacef0d17b56ba9a http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_57c5c018dc689975b6bc5d45815422c7 |
publicationDate |
2016-12-29-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
KR-20160150157-A |
titleOfInvention |
method of building natural stone brick and vegetation material |
abstract |
The present invention relates to a method for constructing castle stone using natural stone and a vegetation member for filling a gap and, more specifically, to a construction method for constructing castle stone by making the castle stone with natural stone collected in a stone mountain without an additional cutting process, and by rupturing the natural stone in a constant size. Moreover, the present invention relates to a vegetation member for filling a gap to fill a gap generated in the castle stone. |
priorityDate |
2015-06-18-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |