http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102406466-B1
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_1582d642b41c963f4fbfa6a95a6cf78a |
classificationCPCAdditional | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02W30-91 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G01N21-251 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G01N21-78 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G01N33-383 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G01N1-38 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01N1-38 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01N21-78 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01N21-25 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01N33-38 |
filingDate | 2021-10-21-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2022-06-08-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_01785187dfa2462c5843459d1684e031 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_f1bf35fe973b55089c2397a3ac656382 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_161c441117fc6e2f88267802848322ad |
publicationDate | 2022-06-08-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | KR-102406466-B1 |
titleOfInvention | Technology for chloride content test in concrete and measuring method of chloride content test in concrete thereof |
abstract | Concrete chloride content measurement technology according to the present invention is a reference sample 100 made by mixing a powder sample 10 collected from a concrete structure 1 with water 20; a comparative sample 200 made by mixing the powder sample 10 and the silver nitrate 30; The color difference meter 300 is included, but the chloride content of the concrete structure 1 is measured by comparing the color difference between the reference sample 100 and the comparative sample 200 with the color difference meter 300 . At this time, the powder sample 10 is the powder 2 recovered by drilling the concrete structure 1, and it is preferable that the powder 2, obtained by sifting the powder 2 No. 20, is a sample of 2700-2900 cm2/g. . |
priorityDate | 2021-10-21-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 30.