http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102205809-B1
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_073e245bc2dab5f8b146136a3d041252 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-063116 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-063114 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-063118 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-0637 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-103 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-109 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-06312 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-06 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-10 |
filingDate | 2020-06-12-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2021-01-22-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_6ce33ece36373e06e7d65d028b373d68 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e5b2e72cf3b0640139f0febfda0b5092 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a162865c9df0743092eaea84a4cadd1a |
publicationDate | 2021-01-22-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | KR-102205809-B1 |
titleOfInvention | Method for calculating schedule of multi-allocation type crowdsourcing based projects for artificial intelligence training data generation |
abstract | A multi-allocation crowdsourcing-based project schedule calculation method for generating artificial intelligence learning data is provided. The method includes calculating the reliability of each of a plurality of workers of the crowdsourcing platform, setting a target reliability of a multi-allocation project, calculating an expected schedule corresponding to the target reliability of the project, and the calculated prediction Including the step of providing a schedule to the client of the project, the multi-allocation type project includes a task of selecting an answer to a question that requires subjective evaluation, the step of calculating the reliability, the operator Calculating the number of inputting work results corresponding to multiple opinions among the work results of a plurality of workers including the worker, and calculating the work results corresponding to the majority opinion relative to the total number of performing the multi-allocated tasks of the worker. Comprising the step of calculating the reliability of the worker based on the number of inputs, and calculating the expected schedule of the project includes: extracting a worker whose reliability is greater than or equal to the target reliability of the project, and the extracted worker's task 1 And calculating an average work time per case, and calculating an expected schedule of the project based on the calculated average work time per work and the total number of work of the project. |
priorityDate | 2020-06-12-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Predicate | Subject |
---|---|
isDiscussedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID3033151 http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419499693 |
Total number of triples: 23.