Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_6a57d0896477b265c981b1c2b334af55 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E01D19-103 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D127-12 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E01D21-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C08L27-12 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C08L27-18 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D127-18 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D7-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E01D22-00 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E01D21-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E01D22-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E01D19-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D127-12 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D7-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D127-18 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C08L27-18 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C08L27-12 |
filingDate |
2020-07-20-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate |
2020-11-24-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_4a68634f4c059ed86b33e016cf4e04f1 |
publicationDate |
2020-11-24-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
KR-102181972-B1 |
titleOfInvention |
Bridge inspection facility construction method and bridge inspection facility constructed thereby |
abstract |
The present invention relates to a method of constructing a bridge inspection facility using a pre-embedded anchor, wherein the anchor panel is pre-installed in the form of buried in the pier during the construction of the bridge inspection facility, so that the fixing and installation work of the inspection passage bracket is made more efficiently To be able to. The construction method of the present invention for realizing this includes a formwork installation step of installing a formwork 10 on the pier 100; An anchor panel installation step of attaching and installing an anchor panel 20 having a plurality of bolt holes 21 formed on the inner wall surface of the formwork 10; An anchor coupler fastening step in which an anchor coupler 30 of a predetermined length is coupled to the anchor panel 20, and a support rod 40 is connected to the rear end of the anchor coupler 30; A reinforcing bar welding step of welding and fixing the reinforcing bar 50 to the support bar 40; A concrete pouring step of pouring concrete (S) into the formwork 10; Removing the formwork to expose the anchor panel 20 by removing the formwork 10 after curing the poured concrete; And an inspection passage installation step of bolting the inspection passage bracket 200 to the exposed anchor panel 20. |
isCitedBy |
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102358994-B1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102441003-B1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102440268-B1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-20220112615-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102479439-B1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102548360-B1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/KR-102451762-B1 |
priorityDate |
2020-07-20-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |