http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-H11239830-A
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_a3cd68b70ab0a853729c6a2b276a01fe |
classificationCPCAdditional | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02P90-30 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02P90-02 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G05B19-418 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B21D28-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B21D28-36 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B23Q41-08 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B65G61-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G05B15-02 |
filingDate | 1998-02-25-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_6db37ade8b75caf1fedf3f7463825c06 |
publicationDate | 1999-09-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | JP-H11239830-A |
titleOfInvention | Method and apparatus for setting scheduled processing time in plate material processing machine |
abstract | (57) [Summary] [PROBLEMS] To improve the accuracy of the predicted time of work processing in a plate material processing machine, thereby improving load distribution and reliability of a production plan. SOLUTION: When performing a line processing of a workpiece by a plate material processing machine 1, each time one workpiece W is processed, a time when a processing start signal of the workpiece W is transmitted and a time when a processing completion signal of the workpiece W is received. The time is read by the line control unit 47 of the line control device, and the actual processing time of the workpiece W is calculated from the two times. By updating the set processing time based on the parameter data stored in advance to the calculated actual processing time for each single processing of the workpiece W, Since a new set machining time is calculated in accordance with the actual situation, a more accurate and reliable production plan is performed. |
isCitedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2010204758-A |
priorityDate | 1998-02-25-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Predicate | Subject |
---|---|
isDiscussedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID3033151 http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419499693 |
Total number of triples: 22.