Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_1a972f3bdeb631064dfe94e5ed0056c7 |
classificationCPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J2290-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J2215-50 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J2215-42 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B01J19-0033 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J3-04848 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J3-04224 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J3-04357 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/F25J3-04393 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q30-0283 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/F25J1-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B01J19-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G05B13-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G05B13-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/F25J3-04 |
filingDate |
1993-07-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_42f9dbd7a490adc572f0453c31e079f3 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_4e38aa57b64e739a2ad320450cd015f7 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_4f4d10bcaf027255710b58608bc99abf |
publicationDate |
1994-07-05-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
JP-H06182192-A |
titleOfInvention |
Chemical process optimization method |
abstract |
(57) [Summary] [Purpose] To provide an optimum manufacturing schedule for manufacturing a product satisfying the total product demand with a minimum energy cost. A method for producing two or more products from a manufacturing site, such as an air separation plant, to meet a given demand for each product, the solution of which is given. Energy consumption and product so that product production can be determined from a mixed-integer linear programming model that provides an optimal production schedule for producing product to meet total product demand with minimal energy cost over time intervals Manufacturing. |
isCitedBy |
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2005532529-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/WO-2009107373-A1 http://rdf.ncbi.nlm.nih.gov/pubchem/patent/US-8626351-B2 |
priorityDate |
1992-07-29-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |