http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2022013483-A

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_b477cdf2692ef459a8749fce03a83e1b
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E03F5-10
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E03F3-04
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/H02G9-06
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/H02G1-06
filingDate 2020-06-29-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_11d3d65d215074f11881c6276ee922f8
publicationDate 2022-01-18-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber JP-2022013483-A
titleOfInvention Construction method that simultaneously divides sewerage and undergrounding electric wires, electric wire utility tunnel and catchment basin
abstract PROBLEM TO BE SOLVED: To temporarily install or relocate existing water pipes, gas pipes and sewage pipes generated when a combined sewer is improved to a diversion type and a power line or a communication line is buried in the ground from an electric pole on a living road. And reduce the construction period, eliminate the step between the existing L-shaped gutter at the end of the road and the private land (barrier-free), so that even if it rains heavily, no water pool can be formed at the end of the road. By improving the road to make it easier to walk and reducing the complexity that occurs when the combined sewer system is divided into two systems, rainwater and sewage, the number of catchment basins is reduced, sludge cleaning is made more efficient, and environmental pollution countermeasures are taken. And. SOLUTION: "A general road cross section with a high convex center on the road surface" is remodeled into a "concave cross section with a low center on the road surface", and the rainwater culvert of the combined sewer at the end of the road is removed. Then, a utility tunnel for electric wires was installed at the removed location, a rainwater culvert for the diversion type sewer was newly installed in the center of the remodeled road, and the catchment basin for the newly constructed rainwater culvert was placed in the upper space of the sewage manhole for the diversion type sewer. Install. [Selection diagram] Fig. 1
priorityDate 2020-06-29-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID5339
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID426080512
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962

Total number of triples: 17.