abstract |
The manufacturing system (50) of the cementum panel (10) and embodiments of the manufacturing method can be used to produce a cementum panel (10) having a multilayer air / water barrier membrane assembly (18). The layers (21, 22, 23) of the membrane (18) can be formed, for example, via a series of applicator stations (72, 75, 78) that apply the fluid composition using roll coating. Between the applicator stations (72, 75, 78), the coating layer of the fluid composition can be exposed to drying conditions via infrared heating. To help protect against the harmful effects of infrared heating, the cementum panel (10) may be transported through cooling tunnels (93, 103, 113) after each drying section (92, 102, 112). .. [Selection diagram] Fig. 3 |