http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2004083963-A

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_2dcebf5a7f7ddc3b081f70e8ce1c4097
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C21C1-06
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C21C5-28
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C21B5-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C21C1-02
filingDate 2002-08-26-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_135f34a1196d99f24b8804d9e599a0c3
publicationDate 2004-03-18-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber JP-2004083963-A
titleOfInvention Hot metal logistics control device, hot metal logistics control method and program
abstract [PROBLEMS] To sufficiently reduce the cost in the hot metal pretreatment process while taking into consideration the total amount of molten metal discharged to each converter charge and the required value for each converter charge of the components contained in the molten steel in the converter charge. . A hot metal discharge amount temporarily allocated for each combination of a topped car and a converter charge and a required value for each converter charge of components contained in molten steel in the converter charge are input from a host system, and the hot metal discharge amount In addition to determining the target value of the component, the cost in the hot metal pretreatment process is calculated and registered as the initial value of the provisional plan (S1 to S3). The hot metal discharge amount is changed, the target value of the component with respect to the hot metal discharge amount after the change is determined, the cost in the hot metal pretreatment process is calculated, and it is determined whether or not the provisional plan should be updated (S4 to 6). . If the update condition of the provisional plan is satisfied, the provisional plan is updated (S7), then the end condition is determined (S8), and if the end condition is satisfied, the provisional plan is output (S9). If the end condition is not satisfied, the hot metal discharge amount is changed again (S4). [Selection] Figure 4
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2016130331-A
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/JP-2010159479-A
priorityDate 2002-08-26-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419491185
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID23925
http://rdf.ncbi.nlm.nih.gov/pubchem/taxonomy/TAXID86063
http://rdf.ncbi.nlm.nih.gov/pubchem/anatomy/ANATOMYID86063

Total number of triples: 19.