http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-215925993-U

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_d6a6f422b091ba12ea61d4adbf1b0e8e
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_f5e6205fcaf2fa720cdb08698b8b8e49
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D17-04
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D5-46
filingDate 2021-08-17-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2022-03-01-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_7cf98122c58205af68b7f92f26299133
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a50ed2519d54117a59e9fef4efd9dbd9
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_46490e613f0917b9ee0a931af18ade89
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_fb10824afc764ed6e7ada2533cdececd
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_0defa62a897f0623c924f79d67f8f76d
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_538996e6dfc848f132b19a87a49da307
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_7b79266e9b53554687e95b3dea5863c8
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e1e79fbf3bf992ecc77ea8803b7f7fd8
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_05dab0509217cedff82bf49a120c85a9
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_1ae6fa78468114aa45ad63a713941b84
publicationDate 2022-03-01-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-215925993-U
titleOfInvention Double SMW worker method pile foundation hole supporting construction
abstract The utility model provides a double-row pile foundation pit supporting structure based on an SMW (soil mixing wall) construction method, which comprises a first cement mixing pile supporting wall arranged close to a foundation pit and a second cement mixing pile supporting wall arranged far away from the foundation pit, wherein the two cement mixing pile supporting walls are formed by sequentially overlapping and lapping first cement mixing piles, H-shaped steel is inserted into the first cement mixing piles, the two cement mixing pile supporting walls are connected through a plurality of rigid connecting pieces, a plurality of mixing pile walls are arranged on one side of the second cement mixing pile supporting wall far away from the foundation pit, the mixing pile walls are formed by overlapping and lapping second cement mixing piles, H-shaped steel is also inserted into the second cement mixing piles, and two ends of each mixing pile wall are connected with the second cement mixing pile supporting wall to form a separation bin. The utility model can quickly find the leakage points to accelerate the construction water stopping speed, and can also improve the pile strength of the SMW construction method to adapt to larger excavation depth.
priorityDate 2021-08-17-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962

Total number of triples: 24.