http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-214302741-U
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_d755bcf7e0cd2ce9e4dc6b6d2194ba41 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04F21-22 |
filingDate | 2021-01-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2021-09-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_4f4dd827255c7cb6f07f5d12730a66fe http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_3f0790e1e38f1080d8498791258fa53f http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_d83071f29169cb7b7d3a5e1ca4a7cfca http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_0fae4d5e807b57e567fbf362e3b38e18 |
publicationDate | 2021-09-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-214302741-U |
titleOfInvention | Building ground decorates laying device |
abstract | The utility model discloses a building ground decorates laying device, include bottom plate, handrail, remove the wheel, bottom plate one side is provided with the handrail, the bottom plate bottom is provided with 4 remove the wheel, the inside row's of inlaying of bottom plate material side pipe, the bottom plate top is close to row material side pipe department is provided with the striker plate, striker plate one side is provided with the material box, material box one side be provided with can with the pushing equipment that the material in the material box was released, still including can handle ground preliminary treatment mechanism in advance and can carry out the compaction with plank or ceramic tile. Has the advantages that: the utility model discloses be provided with preliminary treatment mechanism and compacting mechanism, can treat before laying and lay the district and carry out the preliminary treatment, avoid waiting to lay district's cement thick liquids too much, make ceramic tile or plank height after laying uneven to reduce and lay the quality, can also carry out the compaction to ceramic tile or plank after laying, thereby improve work efficiency. |
priorityDate | 2021-01-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Predicate | Subject |
---|---|
isDiscussedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID90787 http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID415789328 |
Total number of triples: 16.