http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-213294768-U
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_a89bb84334c7b251ea7b83d6227def14 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C02F1-30 |
filingDate | 2020-09-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2021-05-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_0757c36c513abe7225c55166354bfde4 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_80696524ae941e00a99e0a592dbcb4f6 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_3accb5692284a7931ac0ee011a6ae9f1 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_ac7974c9bd8e5021d778f8fb3d0780bf |
publicationDate | 2021-05-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-213294768-U |
titleOfInvention | Assembled solar water purification reactor |
abstract | The utility model provides an assembled solar energy water purification reactor, including the reaction box with be located a plurality of transmission light-collecting tubes of reaction box inside, the reaction box includes half case on the left side and half case on the right side of mutual articulated, the end of transmission light-collecting tube all communicates there is the adapter sleeve, the adapter sleeve has the external screw thread section that is located the port department and is located the inside sealing of adapter sleeve, the excircle of transmission light-collecting tube is pasted to the sealing, the port that the adapter sleeve kept away from the transmission light-collecting tube all communicates fixed cover, fixed cover is located on the reaction box inner wall, one side port threaded connection of fixed cover has the connecting pipe. The utility model discloses a butt of adapter sleeve and fixed cover and the connecting pipe on the fixed cover have realized the random loading and unloading of transmission light-collecting tube, no longer need demolish other parts for overall structure designs more rationally, has reduced staff's operating procedure. |
priorityDate | 2020-09-07-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 18.