http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-207436320-U

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_ac31afbea1cbbb03498644721ffb4a62
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B1-343
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B2-56
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B2-60
filingDate 2017-11-14-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2018-06-01-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_0fb6ab36a94c4aecd5fb33d4e3801545
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_05bf1b809710f3909540961d15a897ae
publicationDate 2018-06-01-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-207436320-U
titleOfInvention A kind of installation fixed structure of building wall board
abstract The utility model discloses the installation fixed structures for building wall board.The structure includes collar tie beam, H-type lower ring beam, bracket, lateral pressing device, combined wall board, bolt in steel construction H-type column, H-type.Its main feature is that the direction by planning H-type column, utilize collar tie beam and lower ring beam in two kinds of different size of corbels supports, lateral pressing device is placed using the groove of H-type column, ensure that wallboard is laterally attached close, utilize the customizability of combined wall board, settled water & electric pipe road and the back court processing and manufacturing such as magazine arrangement, beam, column, floor, the accuracy of manufacture are high.It can be installed without large scale equipment.The utility model dramatically saves site operation difficulty and cycle, reduces the workload of secondary decoration, and building precision is high.It is heat-insulated, water resistance is high.Whole building is removable removes simultaneously, reusable, avoids soil hardening, and scene energy conservation and environmental protection and highly shortened construction period without dust, noise pollution, reduce construction cost.
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-107795035-A
priorityDate 2017-11-14-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635

Total number of triples: 17.