classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D33-00 |
filingDate | 2016-05-10-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2016-11-30-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_53bd8c2dd4d83c0441765fcec86cb827 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_9c39d23650c5649826fee6fe66a8b0cf http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_1134026b6d02a5c4cd59101644736739 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_632dc88e36515f5cadcfc131e13a1715 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_7ab9076c9024c9d6f3a9b67de27eaa9c http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_32a191929e0b76e75efc34152121eadd http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_3c8b78f05ada41e34125131b6587dbc0 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a3cd8a73fc82c6907fd78446eeb9fb20 |
publicationDate | 2016-11-30-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-205742300-U |
titleOfInvention | Immersed tube tunnel basis fills sand equal proportion model test platform |
abstract | This utility model provides a kind of immersed tube tunnel basis and fills sand equal proportion model test platform, including experimental tank, wherein said experimental tank is divided into filling sand test district (12) and modelling district (15) by partition wall (14), the periphery of described experimental tank is side slope (11), i.e. test the aperture area base area more than experiment pond in pond, and concrete bed course of being always or usually as specified also is laid in the bottom surface of described experimental tank.This utility model can not only be studied single hole and fill sand, fills sand construction order and the relatedness impact on sand filling effect thereof, but also can study the filling sand hole position impact on sand filling effect;Having operating condition of test many, monitoring sand filling effect is directly perceived, effective, the advantage of the repeatable utilization of model.This utility model is that inspection immersed tube tunnel basis fills sand construction technology, determines the monitoring method filled in sand work progress and work out the important tool of sand filling effect evaluation criterion. |
isCitedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113671488-B http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-105862939-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113671488-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-105862939-B |
priorityDate | 2016-05-10-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Predicate | Subject |
---|---|
isDiscussedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962 http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635 |
Total number of triples: 26.