http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-205581100-U
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_d6a6f422b091ba12ea61d4adbf1b0e8e |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G01N33-24 |
filingDate | 2016-04-01-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2016-09-14-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_10541b0752ace1642c81294f9925f389 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_2888264c934783b809ae75b4459e752b http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_68af987ed361e1d9b9fa1c10daadd8bc http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e7aa082c5e1bd7315bdab3f0291d83c3 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_25e0b514b8e161bb628e746481ea1b62 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_45ab12ff009a5a34256318bf85c360c6 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_6b5365a5777ad966ae45c78bc1511bde |
publicationDate | 2016-09-14-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-205581100-U |
titleOfInvention | Excavation process's foundation ditch model test device can simulate |
abstract | The utility model discloses an excavation process's foundation ditch model test device can simulate. Keep off native unit, retaining wall, support element and support reaction frame including mold box, plane of symmetry, the mold box includes model upset frame frame, toughened glass and mold box bottom plate, the plane of symmetry keeps off native unit and is U type stainless steel strip for interim is kept off the passive side of foundation ditch and is not excavated the soil body, through the bolt fastening on model upset frame frame, threaded hole is opened at the retaining wall middle part, through the required fixing bolt of screw hole threaded connection installation support element, support reaction frame two blocks of trapezoidal steel sheets around by, lower parts about and three rectangle steel sheets welding form, set up in mold box one side. The utility model discloses each construction operating mode of actual foundation ditch excavation project can be simulated, analogue test's accuracy has been ensured, can realize the test simulation of foundation ditch excavation overall process, the theoretical research of excavating the problem for the foundation ditch provides effectual experimental data support to design and construction for relevant foundation ditch engineering provides certain reference suggestion. |
isCitedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-105842421-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-109555170-A http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-106645640-B http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-106645640-A |
priorityDate | 2016-04-01-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Predicate | Subject |
---|---|
isDiscussedBy | http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419491804 http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID5359268 |
Total number of triples: 23.