http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-205530848-U

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_b3d375c6402cbd9a9efcd66fa4c4f353
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B2-86
filingDate 2016-04-26-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2016-08-31-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_377d799cfce89ef8e72525cf61e16695
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_5aaec135b34cca04d4b955c132224589
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a97c1bf447fcb917c0cd9142db01b5f4
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a0525b1970cd1d61189f458f9fc02a85
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_b4bfe2cdd7884576a775934e27159656
publicationDate 2016-08-31-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-205530848-U
titleOfInvention Steel construction turning wall component with brace of putting more energy into
abstract The utility model discloses a steel construction turning wall component with brace of putting more energy into, including at least one wall body main part, the wall body main part has side square steel tube and two wall unit, and every wall unit includes preceding wallboard, back wallboard and the brace of putting more energy into, and preceding wallboard is the vertical parallel arrangement of tandem with the back wallboard, and the forward is relative. The brace of putting more energy into has a plurality ofly, and vertical layout is in the front wallboard and the back wallboard under to by last, and the both ends of the brace of respectively putting more energy into are connected with the preceding wallboard and the middle part of back wallboard respectively. Two wall unit, the H shaped steel through vertical setting connects gradually from beginning to end. The side square steel tube is located last precedence wall unit's the outside, the one side and the last precedence wall unit fixed connection of side square steel tube. The utility model discloses a convenience is pour in the site assembly construction, need not the formwork, has saved a large amount of templates, and installs and dismantle the time of template, does not need artifical assembling reinforcement, can realize industrial production and prefabricated construction, has improved building speed.
priorityDate 2016-04-26-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/anatomy/ANATOMYID8022
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419481425
http://rdf.ncbi.nlm.nih.gov/pubchem/taxonomy/TAXID8022
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID5288910

Total number of triples: 19.