http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-114307578-A
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_1faec97486eccfc6d626b18f33b03297 |
classificationCPCAdditional | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02A50-20 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F17-11 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B01D53-77 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B01D53-56 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B01D53-50 |
filingDate | 2021-12-31-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_34375145b6fe7918833983418bddc745 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a8fc90e8141addec41ae782124c1d409 |
publicationDate | 2022-04-12-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-114307578-A |
titleOfInvention | Industrial flue gas purification method and system based on intelligent control |
abstract | The invention provides an industrial flue gas purification method and system based on intelligent control. The industrial flue gas purification is performed by the following steps: obtaining the first sulfide concentration and The first nitrate concentration; the first predicted quantity of the reaction product is generated according to the first sulfide concentration, the preset sulfide conversion rate and the sulfide conversion weight value, according to the first nitrate concentration, the preset nitrate reduction rate and The weight value of nitrification reduction generates a second predicted quantity of demand products; if the second predicted quantity is less than the first predicted quantity, control the first valve in the first discharge pipeline to open and the bypass valve of the bypass pipeline to close, and obtain the second predicted quantity. Set the second nitrite concentration of the first discharge pipeline at each second moment in the time period; if the average concentration value of nitrite discharge is greater than the preset nitrite concentration value, control the first valve in the first discharge pipeline to close and bypass The bypass valve of the pipeline is open. |
priorityDate | 2021-12-31-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 25.