http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113293767-B
Outgoing Links
Predicate | Object |
---|---|
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-01 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D19-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D17-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06F30-13 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D3-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-016 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06F30-23 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D1-00 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D17-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D3-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D19-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D1-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F30-23 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F30-13 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D27-01 |
filingDate | 2021-05-25-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2022-12-16-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationDate | 2022-12-16-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-113293767-B |
titleOfInvention | Construction system and method for upper part of underground structure |
abstract | The application relates to the field of construction, and provides a construction system and method for the upper part of an underground structure. The upper soil construction system of the underground structure includes a dewatering well, multiple engineering piles, a simulation analysis system, an on-site data monitoring system and a control system. The actual vertical uplift deformation value is less than or equal to the simulated vertical uplift deformation value simulated by the simulation analysis system. The control system combines the effective data obtained by the on-site data monitoring system with the simulated precipitation depth value and simulated vertical uplift deformation value simulated by the simulation analysis system. The actual vertical uplift deformation value of the underground structure is less than or equal to the simulated vertical uplift deformation value, so that the vertical uplift deformation of the underground structure does not exceed the specified allowable range at all times, ensuring the stability and safety of the underground structure. |
priorityDate | 2021-05-25-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 29.