http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113293767-B

Outgoing Links

Predicate Object
classificationCPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-01
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D19-10
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D17-02
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06F30-13
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D3-02
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-016
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06F30-23
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D1-00
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D17-02
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D3-02
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D19-10
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D1-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F30-23
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F30-13
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D27-01
filingDate 2021-05-25-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2022-12-16-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationDate 2022-12-16-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-113293767-B
titleOfInvention Construction system and method for upper part of underground structure
abstract The application relates to the field of construction, and provides a construction system and method for the upper part of an underground structure. The upper soil construction system of the underground structure includes a dewatering well, multiple engineering piles, a simulation analysis system, an on-site data monitoring system and a control system. The actual vertical uplift deformation value is less than or equal to the simulated vertical uplift deformation value simulated by the simulation analysis system. The control system combines the effective data obtained by the on-site data monitoring system with the simulated precipitation depth value and simulated vertical uplift deformation value simulated by the simulation analysis system. The actual vertical uplift deformation value of the underground structure is less than or equal to the simulated vertical uplift deformation value, so that the vertical uplift deformation of the underground structure does not exceed the specified allowable range at all times, ensuring the stability and safety of the underground structure.
priorityDate 2021-05-25-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962
http://rdf.ncbi.nlm.nih.gov/pubchem/protein/ACCP79227
http://rdf.ncbi.nlm.nih.gov/pubchem/protein/ACCQ63341
http://rdf.ncbi.nlm.nih.gov/pubchem/protein/ACCP34960
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635
http://rdf.ncbi.nlm.nih.gov/pubchem/protein/ACCP39900

Total number of triples: 29.