http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-112801314-A

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_c975bfde5bdad9f125bfce2b643fc0e8
classificationCPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-101
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-20
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q50-02
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q50-02
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-10
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-00
filingDate 2021-01-27-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_26f1194ece9da16ead4de1957c840c0f
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_c9caedb61368295fd648a46876878a63
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_19989ded66577f97af46da0288fe238d
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_99c91e9a64c5209e40c94589a1115338
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_cfdfe17333002060f7554b1d1ba295ce
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_20b1845b142f6327fbc4357f631559a9
publicationDate 2021-05-14-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-112801314-A
titleOfInvention A smart service method and system for coal mining enterprises
abstract The invention discloses a smart service method and system for coal mining enterprises, comprising: collecting real-time data of mine production equipment; comparing the collected real-time data of mine production equipment with a preset analysis and diagnosis database of mine production equipment, and determining whether to Generate a fault work order; if a fault work order is generated, compare the generated fault work order with the preset fault work order library, and judge whether a work order needs to be dispatched according to the comparison result; if no fault work order is generated, the expert Remotely conduct online diagnosis of mine production equipment, and judge whether a work order needs to be dispatched according to the diagnosis result; if a work order is dispatched, the implementer will confirm whether the work order needs to be executed; The personnel and the mine personnel jointly confirm whether the work order is completed; if the work order is not executed but not completed, the work order will continue to be executed until the work order is not completed.
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113610236-A
priorityDate 2021-01-27-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419559581
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID297

Total number of triples: 23.