Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_c569ddf3b8fe38e3a8063b1d0ae7bd88 |
classificationCPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C04B2111-40 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C04B28-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D15-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D5-34 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D7-00 |
classificationIPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C04B111-40 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D5-34 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D7-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C04B38-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C04B28-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D15-02 |
filingDate |
2020-12-24-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_25da486e62175b7f4dc0f1286cb083af http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_c1c4b33437ae0cc102dbb43f1d237688 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_3b57b4810f9b843ade81423d5a9a4bde http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_11e14dfa0acf107a6bfc996641a9fc24 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_a97a8c6b20586af1f1063fca96d52f70 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_f3e4a2cfa143c89abb53744fddd8cd65 |
publicationDate |
2021-04-13-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
CN-112647493-A |
titleOfInvention |
Moisture-preserving mortar, pile drilling, pile, concrete and green energy-saving construction process |
abstract |
The invention provides a construction process of moisturizing mortar, pile drilling, pile, concrete and green energy conservation, which can be suitable for areas with low water content in an underground soil layer and improve the strength of the pile after construction in the areas, wherein the moisturizing mortar comprises the following components in percentage by weight: 100 parts of cement, 600 parts of sand material 300-; the moisture-preserving pile body drilling hole comprises a hole body, wherein the inner wall of the drilling hole is sprayed with the mortar moisture-preserving layer. The moisture-preserving pile body comprises a pile body, wherein the periphery and the bottom of the pile body are surrounded with the mortar moisture-preserving layer. The green energy-saving construction process comprises the following steps: (1) drilling; (2) spraying a mortar moisture retention layer; (3) and (5) pile body construction. |
priorityDate |
2020-12-24-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type |
http://data.epo.org/linked-data/def/patent/Publication |