Predicate |
Object |
assignee |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_c88962ec12172750a8fc1e9248203231 http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_8e1825213944cac805abd46d02ed7416 |
classificationCPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D2250-003 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C04B2111-70 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D2300-0023 |
classificationCPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C04B28-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D33-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D15-02 |
classificationIPCAdditional |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C04B111-70 |
classificationIPCInventive |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D33-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D27-40 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C04B28-02 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D15-02 |
filingDate |
2020-05-15-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor |
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_accdb1d6600d55431d25d39ef8551cd6 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_b9a1c036de65028507dac41cf9dde826 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_d4f8aefdcbc8f53b1c6c2f2fd4eb736e http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_10d7a74abe401b45ec6cda8fb06f9a12 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_725ee1af761650639e4b6049df36e3db http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_1903af7fb580951418aafb6d091a3a56 |
publicationDate |
2020-09-22-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber |
CN-111691470-A |
titleOfInvention |
Consolidation grouting construction test method applied to dam foundation |
abstract |
The invention discloses a construction test method for consolidation grouting applied to a dam foundation, comprising: step 1, measuring and setting out, and calibrating a water press hole and a grouting hole on the weighted concrete area of the dam foundation; step 2, drilling Drilling operation, drilling the water press holes and the grouting holes; step 3, drilling flushing, flushing the drilled holes with pressurized water before pressing water; The water permeability of the rock mass at the hole and the grouting hole under different water pressures; Step 5, the grouting adopts the step-up pressure method to carry out cement slurry injection; Step 6: Carry out a water pressure test on the water pressure hole; Step 7 : Seal the grouting hole. The construction test method of the present invention can perform the consolidation grouting test more conveniently by configuring the relative positions of the water-pressing holes and the grouting holes, and the steps of performing the water-pressing test and the cement slurry pouring on the water-pressing holes and the grouting holes. Obtain infiltration data to provide a basis for strengthening the dam foundation and maintaining the stability of the dam. |
isCitedBy |
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-113445471-A |
priorityDate |
2020-05-15-04:00^^<http://www.w3.org/2001/XMLSchema#date> |