http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-111305397-B
Outgoing Links
Predicate | Object |
---|---|
classificationCPCAdditional | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C08L2205-03 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E04B1-66 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D125-14 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D133-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D7-61 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/C09D7-63 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E04B2-00 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B1-66 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E04B2-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D125-14 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D7-63 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D7-61 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/C09D133-04 |
filingDate | 2020-02-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2021-05-18-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationDate | 2021-05-18-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-111305397-B |
titleOfInvention | Building outer wall waterproof structure and construction method |
abstract | The invention belongs to the technical field of building construction, and provides a building outer wall waterproof structure which comprises an anti-cracking layer, a waterproof layer and a hydrophobic layer, wherein the anti-cracking layer covers the outer side of a building outer wall main body, the waterproof layer is attached to the outer side of the anti-cracking layer, and the hydrophobic layer is arranged on the outer side of the waterproof layer. The construction method of the building outer wall waterproof structure comprises the following steps: s100: after the construction of the building main body is completed, laying an anti-cracking layer on the outer side of the main body outer wall, wherein the anti-cracking layer comprises the steps of scraping and smearing first-time mortar, then adhering and sewing polyester cloth on the surface of the first-time mortar, and then scraping and smearing second-time mortar; s200: after the anti-cracking layer is finished, naturally drying for not less than 30 hours, and then coating a waterproof layer on the anti-cracking layer; s300: and after the waterproof layer is finished, the natural air drying is carried out for not less than 48 hours, and then the hydrophobic layer is sprayed outside the waterproof layer. According to the building outer wall waterproof structure and the construction method, the effectiveness and the long-acting property of the building outer wall waterproof are improved through the three-layer structure and the construction. |
priorityDate | 2020-02-28-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 49.