http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-111199068-A
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_85daf1fd6acaa370002318a70d28cc07 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06T17-05 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/G06Q10-101 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06T17-05 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06Q10-10 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/G06F30-13 |
filingDate | 2019-12-27-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_91a35926ca8ebed15db33b70e8af4124 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_56eaf43660a6ae55d56efcd686c63d4b http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_065cb164bd8ef9777716e29988db1da2 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_eaa50a34b0ff4bba015ce5e89fb304e8 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_50fc6e8dfc2865278b5e5f75bc76b70f http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_7ab15dab13b5158710906eeca744da65 |
publicationDate | 2020-05-26-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-111199068-A |
titleOfInvention | A collaborative design method for water intake of LNG receiving station based on BIM technology |
abstract | The invention discloses a BIM technology-based collaborative design method for a water intake of an LNG receiving station, which includes: building a collaborative platform based on Vault software; establishing a three-dimensional geology for a survey major, excavating a foundation groove based on a geological model for a general plan major; and the water intake designers to carry out the upper design; assemble the model and carry out problem analysis. The present invention establishes an intuitive communication link through BIM collaborative design, and shortens the distance between various professional designers and other parties involved in the construction, even "zero distance", and its coordination scope can be extended to the entire life cycle of engineering construction, It not only brings convenience in communication, but also greatly improves the overall work efficiency in the design process; for the project of reclaiming land to form an LNG receiving station, the integrated design of bank protection and water intake is realized, which not only avoids secondary excavation At the same time, the cofferdam can be formed quickly, which can shorten the total construction period and save costs. |
priorityDate | 2019-12-27-04:00^^<http://www.w3.org/2001/XMLSchema#date> |