abstract |
The invention discloses the construction method of a kind of anticracking bituminous concrete and the anti-seepage connector of clay, leaked using anticracking bituminous concrete and clay core, it is characterized in that, anticracking bituminous concrete is prepared first, then by storehouse slope or dam slope surface asphalt concrete anti-seepage drop ply, the gradient of impermeable layer is identical with the gradient on storehouse slope or dam slope, then lays clay core permeable layers in bottom storehouse, and with the concrete anti-seepage permeable layers overlap that to have one section overlapping.The invention provides a kind of easy for construction, cost is low, the construction method of the anti-seepage connector of the good bituminous concrete of barrier performance and clay. |