http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-103660954-B
Outgoing Links
Predicate | Object |
---|---|
classificationCPCAdditional | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/Y02T10-70 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L2240-547 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60R16-03 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L3-0046 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L3-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L58-16 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L58-20 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/B60L58-13 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B60L3-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/B60L11-18 |
filingDate | 2013-09-18-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
grantDate | 2016-05-04-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationDate | 2016-05-04-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | CN-103660954-B |
titleOfInvention | There is the failure operation power system of multiple energy storage devices |
abstract | The present invention relates to have the failure operation power system of multiple energy storage devices. Particularly, provide a kind of for operating the method for failure operation power system of vehicle, it comprises the voltage on parallel the first or second distributing electric power path arranged of monitoring. Each path comprises corresponding the first and second isolating switches, described the first and second isolating switches are effectively given the power supply of corresponding path by corresponding ability storage device in the time moving with closure state, for giving the one or more load supplied with electric power in each that is divided in these paths. Monitoring controllably operates in the 3rd isolating switch between open-circuit condition and closure state. The closure state of the 3rd isolating switch connects these paths, and the open-circuit condition of the 3rd isolating switch disconnects the connection between these paths. In the time having enabled the predictive mode of operation that needs failure operation electric power, at least one in the described voltage of monitoring controls to open-circuit condition by the 3rd isolating switch while having violated reference voltage, and in the time that the described voltage of monitoring is not all violated described reference voltage, the 3rd isolating switch is controlled to closure state. |
priorityDate | 2012-09-20-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 23.