http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-102444142-B

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_8ae2a23eaf7ba26f18445c4d6b45ce03
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D17-00
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D29-045
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D5-64
filingDate 2011-09-20-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2014-01-15-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_cbfb7e7c6a46c04afe78b88c087b6dd4
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_8cda3706767907a9a8eba7f6572c289d
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_719672956ee8c63f87c7cad556716296
publicationDate 2014-01-15-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-102444142-B
titleOfInvention Pile group column replacement expanded basement and construction method of same
abstract The invention belongs to the technical field of building construction, and particularly discloses a pile group column replacement expanded basement and a construction method of the same. The pile group column replacement expanded basement is used for additionally building a storey of basement below the existing building by reasonably utilizing the underground space without increasing the area of the building on the ground. The pile group column replacement expanded basement includes a basement base plate and bored concrete piles fixedly connected with the basement base plate, wherein a bearing platform is arranged at the top of the bored concrete piles in a matched way, annular ground beams and fender piers are arranged on the circumferences of the bottom parts of the bored concrete piles, and a top plate (1) of the basement fixedly arranged between the bored concrete piles is poured to form a wall body. By adopting the technology, the construction method of the pile group column replacement expanded basement in the earthquake non-resistive area has excellent effects in time limit for the project and the cost, the construction time limit is greatly shortened, another storey of the basement can be added without the need of demolishing the original building, and the costs for demolishing the upper layer building and rebuilding are saved.
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-109723094-A
priorityDate 2011-09-20-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/gene/GID23676
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635
http://rdf.ncbi.nlm.nih.gov/pubchem/gene/GID66106
http://rdf.ncbi.nlm.nih.gov/pubchem/anatomy/ANATOMYID3505
http://rdf.ncbi.nlm.nih.gov/pubchem/taxonomy/TAXID3505
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962

Total number of triples: 22.