http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-102251454-B

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_d6a6f422b091ba12ea61d4adbf1b0e8e
http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_f42a955b543de15b844b9c43a2f0e334
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E01C23-12
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E01C7-18
filingDate 2011-04-27-04:00^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2013-07-24-04:00^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_403888649f22d297fd0c0f2d57a3df80
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_4cdc5fc64592bd3e47acf176701072f4
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_57cd03cf3476973cda2fe02d41dbf5ed
publicationDate 2013-07-24-04:00^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-102251454-B
titleOfInvention Process for quickly repairing semi-rigid substrate damage of asphalt pavement
abstract The invention discloses a process for quickly repairing semi-rigid substrate damage of an asphalt pavement, which comprises the following steps: milling and planing an asphalt topping and a loose substrate at normal temperature, leveling a roadbed, spreading gravels having a thickness of 10-20cm, spreading large stone asphalt mixtures of 25-40cm at twice, paving glass fiber grids, spreading coarse graded asphalt, cooling before opening to traffic for 2-3 days, and finally spreading topping asphalt concrete, thus finishing the quick repair of the semi-rigid substrate damage of an asphalt pavement. The invention can resist high plastic and shear deformation and bear heavy-duty traffic action, has fine rutting resistance, improves the high-temperature stability and water stability of the asphalt pavement, and has fine drainability; the on-site construction process is simple and feasible, and the operation time is short; the reflection crack resistance and pavement deformation resistance of the pavement are improved; the bonding property with the asphalt topping is fine, and the pavement structure can be stressed more evenly, thereby having high lasting quality; and by increasing large stone aggregate and reducing powdered ore, the construction cost is lowered.
priorityDate 2011-04-27-04:00^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635
http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962

Total number of triples: 17.