abstract |
A method, an apparatus and a computer program for manufacturing a pre-insulated skeleton building segment (1) for a building to be constructed, wherein an assembly (2) with a cavity (14) is provided, on which a data carrier (40) is arranged that contains data contains from which a quantity of raw materials can be determined, necessary for forming a foam insulation layer of a thickness (15) in the hollow space (14), which quantity is calculated, and which raw materials are introduced into the hollow space (14), and there foaming and curing for a period (T). |