http://rdf.ncbi.nlm.nih.gov/pubchem/patent/AU-2019444087-A1
Outgoing Links
Predicate | Object |
---|---|
assignee | http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_cfd8f38b70f5ddebc2be694a4d436aa3 |
classificationCPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-14 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E02D27-42 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D9-0607 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D11-386 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D11-08 http://rdf.ncbi.nlm.nih.gov/pubchem/patentcpc/E21D9-001 |
classificationIPCInventive | http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E21D9-06 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E21D9-00 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D15-04 http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E21D11-08 |
filingDate | 2019-11-22-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
inventor | http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_e4ed051df174e7a87dab79955a41085e http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_7216f4480fb267eaf645b5b44f244438 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_21f8dfe5ce59065f26f08a7e4646315f http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_1a4c820852c97c0d560a9dfa119db0b5 http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_29fb56cb297844f1998306ca62b8cc52 |
publicationDate | 2022-01-06-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
publicationNumber | AU-2019444087-A1 |
titleOfInvention | Construction method for shield tunnels passing underneath viaduct in multi-interval, small-clear-distance and overlapping manner |
abstract | Disclosed is a construction method for shield tunnels passing underneath a viaduct in a multi-interval, small-clear-distance and overlapping manner. The construction method comprises the following steps: according to a principle of having the minimal deformation effect on pile foundations of a viaduct and the surrounding environment, formulating an optimal construction sequence for constructing shield tunnels passing underneath the viaduct in a multi-interval and overlapping manner; before a tunnel passes underneath the viaduct, carrying out active isolation reinforcement for construction in which a shield passes underneath for a short distance; constructing the shield tunnel passing underneath the viaduct; in an area where a plurality of shield tunnel sections pass underneath the viaduct in an overlapping manner, reinforcing a segment structure of the shield tunnel and reinforcing the interior of a tunnel hole; and carrying out track vibration reduction and isolation control in a section where the shield tunnel passes underneath the viaduct. |
priorityDate | 2019-05-05-04:00^^<http://www.w3.org/2001/XMLSchema#date> |
type | http://data.epo.org/linked-data/def/patent/Publication |
Incoming Links
Total number of triples: 202.